Update: Directions on resumption of maintenance and construction of energy projects
by Nozipho Bhengu, Director
The regulations issued in terms of the Disaster Management Act, 2020 (“Regulations“), which set out the relaxation of the lockdown restrictions under Alert Level 4, permitted the resumption of civil engineering services for public works projects (including water, energy and sanitation) and public works civil engineering and construction works. In order to provide certainty as to the specific services covered by the Regulations, on 15 May 2020 the Department of Mineral Resources and Energy published directions under the Government Notice No. 542(“Directions“) which provided much needed clarity as to which “civil engineering activities for public works” relating to energy and other additional services are permitted to recommence and continue under Alert Level 4. These specifically include:
- “Civil engineering for public works projects” in so far as it relates to energy, including the following:
(i) projects procured under the Renewable Energy Independent Power Producers Procurement Programme that are currently in construction;
(ii) embedded generation projects under construction and listed in Schedule 2 to the Electricity Regulation Act, 2006 (Act No. 4 of 2006) or licensed in terms of section 7 (1) of the Electricity Regulation Act;
(iii) Eskom new build programme which includes Medupi and Kusile;
(iv) the Department of Mineral Resources and Energy national sodas solar water heater programme and projects;
(v) energy efficiency and demand side management projects;
(vi) national electrification programme;
(vii) liquid fuels (including retails) projects under maintenance and construction;
(viii) liquid Petroleum Gas projects under maintenance and construction; and
(ix) nuclear projects under maintenance and construction in power stations and other nuclear facilities.
In addition, the above, the Directions also confirmed that the following services are permitted under Alert Level 4:
- all professional entities that provide licences, approvals and authorisations for the maintenance and construction of energy projects;
- all professional planning, costing and design work that supports construction work on sites, in anticipation of incremental work on construction sites;
- contracted suppliers, contractors and consultants who need to travel across borders to attend to projects; and
- energy construction work for already priced and awarded government tenders.
Latest News
Tainted treats, spoiled foods and potential dangers…are there any legal safeguards for consumers?
In recent weeks gone by, there have been numerous food poisoning cases reported[1] resulting in serious health issues and, in [...]
It is not only diamonds that are forever – a snapshot of forever and hazardous chemicals
A recent study conducted by the Manchester Metropolitan University revealed that the processes intended to decontaminate noxious liquid landfill waste [...]
Going nowhere fast, proposed amendments to the direct marketing regulations under the CPA published, and your comments are sought!
On October 28, 2024, the Department of Trade, Industry and Competition (dtic) published draft amendments to the regulations under the [...]
The Collection of Premiums on Behalf of Insurers – A Look at the Impact of The Exemption of Juristic Representatives from Section 13(1)(C) of FAIS
and Khanyisa Tshoba, Candidate Attorney Introduction: In practice the need may arise for an insurer to appoint a third party [...]
The effects of the CPA Amendment Act, 2017
and Elia Chitata - Candidate Attorney With the introduction of the Restitution of Land Rights Act 22 of 1994, which [...]
Section 22 – A Springboard into Business Rescue
and Caitlin Steytler – Candidate Attorney In August 2024, Statistics South Africa revealed that 1020 entities filed for liquidation in [...]